Work / Case study

Energy Exemplar

Cloud migration completed in 90 days with zero production incidents

Cloud ArchitectureAWS Cloud SecurityManaged Services

Overview

Cloud capacity for demanding simulation work.

Energy Exemplar builds PLEXOS, the leading energy simulation platform used by utilities, regulators and market operators in 100+ countries. tMinus1 led the AWS migration of their SaaS delivery infrastructure, moving solver workloads from co-located data centres to managed cloud.

Client
Energy Exemplar
Industry
Energy Software
Location
Adelaide, Australia
Services
Cloud Architecture, AWS Cloud Security, Managed Services
Technology
AWS

The challenge

Simulation workloads needed elastic capacity and a repeatable disaster-recovery process.

PLEXOS solver jobs are computationally intensive and latency-sensitive. The existing co-lo environment could not provide the elastic compute capacity customers needed during peak simulation periods, and disaster recovery was a manual process with an untested runbook.

What we built

A phased AWS migration with solver orchestration, scaling, Multi-AZ metadata and operations dashboards.

tMinus1 designed a phased migration: CloudFront and S3 for model file distribution, ECS on EC2 for solver orchestration with Auto Scaling Groups sized for peak demand, RDS Multi-AZ for job metadata, and CloudWatch dashboards giving the operations team real-time visibility. A parallel-run period of four weeks validated parity before the cutover.

How we delivered it

Architecture design and Terraform build (weeks 1–4), parallel run and validation (weeks 5–8), cutover and hypercare (weeks 9–12).

The result

A validated migration and automated failover with an ongoing testing process.

Zero production incidents during the 90-day migration window. Solver throughput increased 40% versus co-lo. Disaster recovery reduced from a multi-day manual process to automated failover tested quarterly.